Prefabricated Changing Room
- 60–120 m², for a single pitch
- Per-m² equivalent ≈ 6.700 – 8.300 ₺/m²
- Showers, WCs and hot-water plumbing set the price
- Same band as the calculator's extra item

Prefabricated building prices in 2026 are in the range of 7.000 – 12.500 ₺/m², production and installation included. We produce and install the three ancillary buildings of a football pitch facility ourselves; below we spell out each one's band, what is and is not in the price, and the per-m² calculation.
All three bands are production and installation prices. Foundation concrete, transport, utility connections and subscriptions, equipment, furniture and VAT are outside these amounts.
Prefabricated building prices in 2026 are in the range of 7.000 – 12.500 ₺/m², production and installation included. For a single pitch, a 60–120 m² changing room falls in the 400.000 – 1.000.000 ₺ band, a 40–100 m² cafe in the 400.000 – 1.250.000 ₺ band and a 30–80 m² administration building in the 250.000 – 1.000.000 ₺ band. The figures are a 2026 market estimate; foundation concrete, transport, utility subscriptions, equipment, furniture and VAT are excluded. The firm price is set by a written quote after the site visit.
The band is 7.000 – 12.500 ₺/m². The lower and upper limits are not two different buildings but two handover levels of the same building; the upper limit is 1,8 times the lower limit.
Advanced shell handover, single-storey building. Structure, panels, doors and windows are installed; interior services and finishes are limited. Dry areas such as a storage room or a plain office sit near this end.
A building with electrical installation and flooring completed and few wet areas. An administration building made up of reception, office and storage stays in the lower–middle part of the band in most projects.
Turnkey: a building with interior services, flooring and wet areas finished. A changing room building dominated by showers and WCs, and a cafe with a glazed façade and kitchen plumbing, sit in the upper half of the band.
| Building | Area assumption | Price band | Per-m² equivalent | How was the band derived? |
|---|---|---|---|---|
| Changing room | 60–120 m² | 400.000 – 1.000.000 ₺ | ≈ 6.700 – 8.300 ₺/m² | Not derived from the per-m² price; read from the same source as the calculator's “Changing Room / Building” extra item. |
| Cafe | 40–100 m² | 400.000 – 1.250.000 ₺ | ≈ 10.000 – 12.500 ₺/m² | 40 m² × 9.000 ₺ = 360.000 ₺, rounded to 400.000 ₺; 100 m² × 12.500 ₺ = 1.250.000 ₺. |
| Administration building | 30–80 m² | 250.000 – 1.000.000 ₺ | ≈ 8.300 – 12.500 ₺/m² | 30 m² × 7.000 ₺ = 210.000 ₺, rounded to 250.000 ₺; 80 m² × 12.500 ₺ = 1.000.000 ₺. |
Per-m² equivalent = lower limit ÷ smallest area and upper limit ÷ largest area; rounded to 100 ₺.
Because the two figures come from separate sources. The changing room item (400.000 – 1.000.000 ₺) was not produced by multiplying by the per-m² band; it was taken from a separate market survey. Divided by an area of 60–120 m², it comes to about 6.700 – 8.300 ₺/m². Its lower end falls slightly below the lower limit of the per-m² band (7.000 ₺/m²), and its upper end below the mid value of the band (9.750 ₺/m²). The reason is that the lower end of the item also covers plain container-type solutions.
If you are planning a turnkey changing room building with showers, WCs and hot-water plumbing finished, also multiply the area by the upper limit of the per-m² band and evaluate the two results together. Example: 60 m² × 12.500 ₺ = 750.000 ₺; the lower limit of the item for the same area is 400.000 ₺.
A prefabricated price cannot be read unless its scope is written next to it. All the bands on this page are given on the basis of the split below.
| Item | In the price | Explanation |
|---|---|---|
| Production of structural steel, wall and roof panels | ✓ Included | Dimensions and plan follow the project; produced in the factory. |
| Door and window frames | ✓ Included | Standard door and window frames are included; a wide glazed façade pushes the price up. |
| On-site installation labor | ✓ Included | Installation on a ready foundation. |
| Interior electrical and plumbing installations, flooring, wet-area fittings | Depends on handover level | Included in turnkey (upper half of the band); limited in advanced shell handover. |
| Foundation and site concrete | ✕ Excluded | Varies with the ground; priced separately after the site visit. |
| Transport | ✕ Excluded | Depends on distance and number of vehicles. |
| Electricity, water and sewer connections and subscriptions | ✕ Excluded | Depends on the tariff of the utility company and the municipality. |
| Kitchen equipment and furniture | ✕ Excluded | Chosen according to the operating model. |
| Design and permit costs | ✕ Excluded | Added to the budget as a separate item. |
| VAT | ✕ Excluded | Shown on a separate line in the quote. |
The formula is spelled out so you can recalculate with your own dimensions. The five sizes in the table are sample footprints.
Building cost (₺) = footprint (m²) × price per square meter (₺/m²)
Example: 7 × 6 m = 42 m² × 7.000 – 12.500 ₺/m² = 294.000 – 525.000 ₺
| Footprint size | Area | Lower limit (× 7.000 ₺) | Upper limit (× 12.500 ₺) | Similar use |
|---|---|---|---|---|
| 6 × 5 m | 30 m² | 210.000 ₺ | 375.000 ₺ | Management office |
| 7 × 6 m | 42 m² | 294.000 ₺ | 525.000 ₺ | Single-pitch changing room |
| 9 × 6 m | 54 m² | 378.000 ₺ | 675.000 ₺ | Administration building |
| 10 × 6 m | 60 m² | 420.000 ₺ | 750.000 ₺ | Cafe with kitchen |
| 13 × 7 m | 91 m² | 637.000 ₺ | 1.137.500 ₺ | Two-pitch changing room building |
Calculate with the lower–middle value for a dry-area building, and with the upper value for a building with wet areas or a glazed façade. The lower limit of the 60 m² cafe in the table appears as 420.000 ₺; since 9.000 ₺/m² is taken at the lower end for the cafe item, the realistic lower value is 60 × 9.000 ₺ = 540.000 ₺. The 91 m² two-pitch changing room building falls outside the changing room item given for a single pitch (60–120 m²); it is calculated with the per-m² band.
These items depend not on the building but on the land, the distance and the operation. When they are written separately, quotes become comparable.
Ground bearing capacity, level differences and fill requirements vary from land to land. The same building needs a different foundation on two different plots; a single figure given without a site visit will be wrong on one of them.
The production price does not depend on the installation address; transport does. Distance, number of vehicles and access conditions to the land determine it; it is written once the address is settled.
Electricity, water and sewer connection fees are the tariff of the utility company and the municipality, not the contractor's price. The distance of the lines from the plot also changes the amount.
Kitchen equipment, changing-room lockers and office furniture are the operator's choice; very different budgets come out for the same building. VAT is shown on a separate line.
For projects in Türkiye, a prefabricated building is subject to zoning legislation like any other. The Zoning Law defines a “building” to include permanent or temporary, fixed or movable structures, and there is no separate exemption for prefabricated or container buildings; a building permit from the municipality or governorate is mandatory for every structure within the Law's scope. For projects abroad, local regulations apply and written information should be obtained from the relevant local authority. Design and permit costs are not included in the bands on this page and must be added to the budget separately.
This note is general information and not legal advice. Because practice varies with the zoning status of the plot, written information should be obtained before starting construction: in Türkiye from the zoning directorate of the relevant municipality, abroad from the competent local authority.
Eight factors mostly explain why two buildings with the same floor area land in different places within the band.
| Factor | Direction | Effect on price |
|---|---|---|
| Handover level (advanced shell or turnkey) | ↑↑ | The biggest factor: the source of the 1,8-fold gap between the two ends of the band. |
| Share of wet areas (showers, WCs, hot water) | ↑ | Plumbing, waterproofing and fittings move the per-m² price into the upper half of the band. |
| Glazed façade and wide door/window frames | ↑ | Frames replace panels; in a cafe, the façade facing the pitch enlarges this item. |
| Insulation level | ↑ | Chosen according to climate and use; in a harsh climate the panel and roof item increases. |
| Number of interior partitions and doors | ↑ | More rooms in the same area means more panels, doors and electrical points. |
| Small building size | ↑ | Fixed items are spread over fewer square meters: for a 30 m² administration building the lower limit is ≈ 8.300 ₺/m². |
| Simple rectangular plan and repeated dimensions | ↓ | Production and installation are faster and waste is lower. |
| Installation on the same site as the pitch | ↓ | It lowers not the building cost but the excluded items: concrete, excavation and transport merge with the pitch works. |
Ancillary buildings are not a small add-on to the pitch budget. The ratios for a pitch of 25 × 45 m are below.
| Building | Price band | Ratio to outdoor pitch budget | Ratio to indoor pitch budget |
|---|---|---|---|
| Changing room | 400.000 – 1.000.000 ₺ | ≈ 28% | ≈ 16% |
| Cafe | 400.000 – 1.250.000 ₺ | ≈ 33% | ≈ 18% |
| Administration building | 250.000 – 1.000.000 ₺ | ≈ 25% | ≈ 14% |
| All three together | 1.050.000 – 3.250.000 ₺ | ≈ 87% | ≈ 48% |
Ratio = mid value of the building band ÷ mid value of the pitch band. Pitch: 1.125 m² × turnkey price per m²; outdoor 2.137.500 – 2.812.500 ₺, indoor 3.937.500 – 5.062.500 ₺. On the building side, foundation, transport, subscriptions and VAT are excluded.
The building's foundation joins the same excavation and pouring program as the pitch infrastructure; no separate crew is called in.
Electricity and water lines are opened together with the cable ducts of the pitch lighting; finished flooring is not broken up afterwards.
Lighting, hot water and kitchen loads are totaled from the start; the subscription is requested for this total capacity.
Pitch and building run under a single quote, a single work schedule and a single point of contact; transport is planned together.
Calculate the pitch budget in the cost calculator Lighting and electricity subscription items
First bring all five to the same footing, then look at the totals.
Is the square meterage measured outer-to-outer? Are the terrace and the area under the eaves included? Convert everything to the same measure.
Advanced shell or turnkey? Are interior services, flooring and ceiling written in the quote?
Showers, WCs and washbasins should be written by number, and the hot-water system by name; "wet area included" is not enough.
Foundation, transport, connections, equipment and VAT should appear on a separate line in every quote.
Compare not the price per square meter but the total cost of the same scope and the quote's validity date.
No. The per-m² band on this page (7.000 – 12.500 ₺/m²) and the three building items exclude VAT and cover production and installation only. VAT is added as a separate line on the written quote, at the rate in force on the invoice date. Read both quotes on the same basis: either both excluding VAT or both including it.
Usually the scope differs, not the price. The upper limit of the per-m² band is 1,8 times the lower limit, and that gap comes almost entirely from the handover level: one quote may be advanced shell, the other turnkey. A quote that buries the foundation, transport and connections in the price also looks expensive at first glance. Two figures cannot be compared until the scope is equalized.
Items such as the door, electrical panel and wet area do not shrink as the building gets smaller; they are spread over fewer square meters. This is clear in the administration building item: for 30 m² the lower limit is 250.000 ₺, i.e. about 8.300 ₺/m², while the lower limit of the per-m² band is 7.000 ₺/m². This is why one large building often comes at a lower unit price than two small ones.
Generally not. 7.000 ₺/m² describes the advanced shell handover level: structure, wall and roof panels, doors and windows are in place, while interior services and finishes are limited. For a ready-to-use building, work from the upper half of the band, that is 9.750 ₺/m² and above. The level on offer is evident from the written scope list.
Yes. When you tick this extra item in the cost calculator, 400.000 – 1.000.000 ₺ is added to the pitch budget; the changing room card on this page is read from the same source. The calculator has no separate item for a cafe or an administration building; for those two you need to calculate them with the bands here and add them to the pitch budget.
No. The cafe item (400.000 – 1.250.000 ₺) covers the production and installation of the building. Kitchen equipment, tables, chairs and the counter are budgeted separately because they depend on the operating model. What does enter the price on the building side is the utility installation these items require; that is why we take 9.000 ₺ per m² at the lower limit of the cafe.
By distance, by how many trucks the building fits on, and by access conditions at the site. A prefabricated building is shipped in parts, so the number of vehicles rises as the building gets bigger. If a crane is needed for unloading, it is written in the same item. Transport is not included in the bands; it is quoted as a separate line together with the installation address.
The calculations on this page use the building's outer-to-outer footprint; check that the area is measured the same way in the quotes. A terrace and the area under the eaves do not count as enclosed area; the 40–100 m² in the cafe item is enclosed area only. If a terrace is wanted, it is priced as a separate item.
The bands are a 2026 market estimate and may change during the year with steel, sheet metal and insulation material prices. A written quote has a validity period; once it expires, the price is recalculated. If you will postpone the order, have the validity date and the price-adjustment clause written into the contract.
Choose the pitch size and extras to see the total budget.
Poles, floodlights, panel and monthly electricity cost, item by item.
Base, drainage, turf, fencing and lighting from a single contractor.
Steel structure, roof covering and ceiling lighting.
Share the type of building, its approximate floor area and the location of the land. We carry out site visits and installations across Türkiye; the included and excluded items appear on separate lines in the quote.